September 2016
By order of the foreign colleagues, the company’s specialists assessed the technical condition and the subsequent repair and certification of containers with built-in facilities for the production of inert gases.
It was dismantled and unloading equipment and subsequent repairs to the hull and floor coverings, strengthening of the floor structure and the subsequent certification of the container.
After all works equipment has been installed and back by request of the client, the container was sent as a SOC to third country to fulfil the contractual obligations of the client.
Enter the phone number and we'll contact you as soon as possible